The retrofit of L2 meant to replace the product pipeline of Line 2 with a mobile/portable solution for sterile filtration and at the same time to change the concept of sterile filtration (redundancy).
During September, we at oncomed completed the testing of a WWT (waste water technology) unit. This unit will be used to decontaminate our waste water from individual workplaces
Are you going to attend CPHI this year? Read the article why you should consider participation, who can you meet there from oncomed and where to contact us for a meeting.
Colaboration with Czech Association of Pharmaceutical Companies
oncomed participated in a discussion with the Ministry of Health and the Ministry of Industry and Trade of the Czech Republic on the support and future of domestic drug production.
oncomed manufacturing, together with 25 other companies from various industries, had the opportunity to take part in a business mission to the USA led by the Confederation of Industry of the Czech Republic. Together, the companies accompanied the President of the Senate, Miloš Vystrčil on his official visit to the United States in Chicago, Washington, D.C. and Richmond, the state capital of Virginia.
After many years of planning and designing, we have successfully completed the mock-up of Line 3. Read the article about the process and challenges we were facing.
With the installation of a Line 3 issues related to capacity, robustness, safety, material flow and many others emerged. Now it is not just a project to install a new production line, but a project to modernize our production.
The retrofit of L2 meant to replace the product pipeline of Line 2 with a mobile/portable solution for sterile filtration and at the same time to change the concept of sterile filtration (redundancy).
During September, we at oncomed completed the testing of a WWT (waste water technology) unit. This unit will be used to decontaminate our waste water from individual workplaces
Are you going to attend CPHI this year? Read the article why you should consider participation, who can you meet there from oncomed and where to contact us for a meeting.
After many years of planning and designing, we have successfully completed the mock-up of Line 3. Read the article about the process and challenges we were facing.
With the installation of a Line 3 issues related to capacity, robustness, safety, material flow and many others emerged. Now it is not just a project to install a new production line, but a project to modernize our production.
Are you going to attend CPHI this year? Read the article why you should consider participation, who can you meet there from oncomed and where to contact us for a meeting.
oncomed manufacturing, together with 25 other companies from various industries, had the opportunity to take part in a business mission to the USA led by the Confederation of Industry of the Czech Republic. Together, the companies accompanied the President of the Senate, Miloš Vystrčil on his official visit to the United States in Chicago, Washington, D.C. and Richmond, the state capital of Virginia.
The retrofit of L2 meant to replace the product pipeline of Line 2 with a mobile/portable solution for sterile filtration and at the same time to change the concept of sterile filtration (redundancy).
During September, we at oncomed completed the testing of a WWT (waste water technology) unit. This unit will be used to decontaminate our waste water from individual workplaces
Colaboration with Czech Association of Pharmaceutical Companies
oncomed participated in a discussion with the Ministry of Health and the Ministry of Industry and Trade of the Czech Republic on the support and future of domestic drug production.